Wharfage Charges (Notice N-2)
Effective on January 1st, 2010
Schedule I - Standard
| Item |
Description of goods |
Unit basis |
Rate ($) |
| 1. |
All goods N.E.S. |
Ton (W) Ton (M) |
3.40 2.63 |
| 2. |
Grain and grain products N.E.S. (excluding cooked cereals) |
Ton (W) Ton (M) |
0.92 0.80 |
| 3. |
Lumber and logs, rough or dressed |
Ton (W) Ton (M) |
0.90 0.71 |
| 4. |
Any goods in big bags |
Ton |
1.52 |
| 5. |
Basic and primary metallic products |
Ton (W) Ton (M) |
1.57 2.23 |
| 6. |
Coal, coke, sand, gravel and stone |
Ton |
0.54 |
| 7. |
Newsprint, woodpulp and basic or primary paper products |
Ton (W) Ton (M) |
1.44 1.14 |
| 8. |
Building board, veneers, plywoods, wallboard and wall panelling |
Ton (W) Ton (M) |
1.59 1.25 |
| 9. |
Goods in standard cargo containers |
Ton (W) |
3.57 |
| 10. |
Grain et Grain products in bulk handled through elevators |
Ton |
0.39 |
| 11. |
Dry bulk commodities N.E.S. |
Ton |
1.09 |
| 12. |
Gypsum in bulk |
Ton |
0.65 |
| 13. |
Petroleum oil, crude or refined including gasoline and similar products in bulk |
Ton |
0.69 |
| 14. |
Liquid products N.E.S. in bulk |
Ton |
1.96 |
| 15. |
Self propelled four wheel motor vehicles: |
Each |
60.38 |
| 16. |
Slurry clay |
Ton |
1.46 |
| 17. |
Alumina |
Ton |
1.11 |
Schedule II - Special wharfage rates and minimum wharfage charges
| Special wharfage per tonne (W) |
$ 1.79 |
| Minimum wharfage per bill of lading |
$ 6.95 |
| Minimum wharfage per invoice (payable only where an invoice is issued exclusively in respect of wharfage charges) |
$ 33.56 |
Schedule III - Demurrage
| 1. |
Demurrage on goods remaining on Corporation property after the expiration of free time shall be assessed as follows: |
|
|
| |
a) for each of the first four working days or part thereof after the expiration of free time, per tonne or part thereof |
Ton (W) Ton (M) |
$ 1.67 $ 1.34 |
| |
b) for each working day or part thereof thereafter, per tonne or part thereof |
Ton (W) Ton (M) |
$ 3.28 $ 2.61 |
| |
c) minimum demurrage per bill of lading is: |
|
$ 8.79 |
Schedule IV - Special projects
Whereas extraordinary expenses for special projects are incurred, the Trois-Rivières Port Authority will determine wharfage charges to be paid based on additional expenses.